Drilling Optimization Program

for open pit mines and drilling contractors

DCA systems' drilling optimization program is built on decades of global experience in drilling and mining. It is designed to meet the needs of
drilling contractors and mining houses.  

Contact Us

DCA drilling optimization program is a comprehensive program that looks at drilling and the related operations from a number of perspectives to offer the best solutions to your specific challenges.

Every drilling operation is different. The process below shows the areas we typically evaluate, but the priorities, targets and implementation plan are always defined site by site.

Our drilling optimization process

We offer a detailed process structure for formulating an appropriate drilling optimization plan. As every drilling site faces different challenges, we keep our evaluations and solutions flexible. Generally, our evaluation follows this program:

  • Initial site-specific evaluation
  • Report to management on findings
  • Recommend, discuss and agree on best path forward
  • Implement plans as agreed
DCA systems team checking drill rigs at on open pit mine

Interested in improving your drilling process?

Let's talk and see how we could help you!

Contact Us

1. Audit

A.

We start with a 3-to-5-day mining/drilling site evaluation to understand the job and the structure of operations. In this time, we evaluate the knowledge and skills of people in following positions:

  • Offsiders
  • Drill rig operators
  • Rock tools personnel
  • Drilling supervisors
  • Mechanical staff
B.

We look into any drilling challenges related to:

  • Utilization rates of drills
  • Availability rates of drills
  • Productive time
C.

We meet separately with mechanical and operational teams to discuss the main issues as seen by site personnel.

Understanding the views of site personnel — and why certain situations have developed — is an important part of our evaluation. We give this background context significant weight when assessing the operation.

D.

We take a broad look around the mining operation to gain insight into the locations, the specific geological challenges of different pits and the working environments.

E.

We observe staff in priority areas, their techniques, and ways of working to gain some insight into their knowledge of the drill rig, its control systems and drilling best practices

F.

We take mechanical tours of workshop conditions, tooling available and questions to understand general knowledge and abilities.

2. Report & recommendations

DCA identifies the problems, explains what is causing them, highlights the priority areas and recommends the actions that should have the biggest impact.

1.  Drilling process planning

We assess how departments relate and interact to ensure a flowing process that keeps drill rigs drilling.

2. Drilling supervision & leading hand

We assess knowledge of different topics including safety, drill rigs, drilling, GUI, rock tools management, planning and monitoring, morning meeting structure, and content and drill bench management.

3. Drilling - operational

We observe specific critical areas which contribute to high drilling costs:

  • GUI screen knowledge
  • Hole start procedure
  • Hole collaring for quality and straightness
  • Drilling pressures applied and limit settings
  • Antijamming settings and knowledge (Flushing & Rotation)
  • Understanding of basic energy transfer principles
  • Understanding of wear patterns of consumables
  • Drilling techniques for ground conditions
  • Attitude towards the job
  • Drilling interaction between machines
  • Supervisor and trainer capabilities & knowledge

4. Drilling consumables

We analyse historical data and current wear patterns on drilling consumables to identify operating pressures and techniques that reduce consumable service life

  • Drilling pressures for efficient energy transfer
  • Operating techniques to avoid stressing drilling tools
  • Drill bit management so transfer of energy is optimal
  • Drilling alignment and deviation
  • Drill “front-end” condition that may affect drilling line
  • Type of re-grinding machines/cups being used

5. Drilling - mechanical

The mechanical department has a major impact on drilling outcomes. We investigate critical areas and look for opportunities to develop staff and provide them with the right tooling and knowledge.

We pay attention to:

  • Mechanical head count
  • Staff knowledge and skills
  • Tooling and resources available  
  • Suppliers & components
  • Drill rig audits and current condition

6. Operations - general

There are numerous general factors that influence drilling outcomes that need to be considered. The factors that matter most vary considerably from site to site.

Typical areas we investigate include:

Based on the audit, we identify the critical areas where performance is being lost, highlight the changes likely to have the greatest impact on operational efficiency, and develop a broader improvement plan.

3. Implementation

After submitting the initial site report, we discuss the findings with you and agree on the actions required to achieve the targets. These may include:

Want the full drilling optimization program?

CASE: Rocksure International's gold mine in Ghana

An 18-month project was initiated after a two-day site evaluation.

The drilling optimization project included, for example, a training and support program for drill rig operators, offsiders, supervisors & leading hands, mechanics with rock tools and drill bit management programs.

DCA provided the tools needed to structure and document the training program, including evaluation matrices to establish a baseline, training workbooks, and records covering theory training, practical training, consolidation and assessment.

Sandvik DPI simulator training was also included.

Results:

  • Drill availability improved from below 70% to over 85%
  • Rock tools cost per metre: YTD -54%
  • Drilled metres per engine hour: +47%
Read more about the results of the Ghana case
Sandvik DPi surface drill at Rocksure International's open pit mine in Ghana.

Other DCA Offering for Best Drilling Efficiency

Equipment transport Sleipner
Sleipner DB series lowboy trailer

Want to discuss where your drilling operation could improve?

Let's talk and find out if we could help you!

CONTACT US
Esa Yrjänä, Managing Director, DCA Systems Ltd.
DCA Systems Ltd..
10 Osae Link
East Legon
Accra, Ghana
info@dcafrica.co

Stay updated

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
LinkedIn
Privacy policy DCA © 2026 All rights reserved.